Baylor Fountain

Location: Baylor University in Waco, TX For this project the challenge was working at a university in a high pedestrian traffic area. Serco was asked to come in and construct a new fountain. We did all the excavation sub base and installed a construct cast-in-place the pump rooms and vaults. We brought the fountain back […]

Baylor Fountain Read More »

C-106 Conveyance

This project included construction of almost 1 mile of concrete channel slope paving and installation of 12’ x 12’ of pre-cast reinforced concrete boxes. The project also required critical control around multiple existing buried pipelines. The challenge was to rebuild an old drainage Channel using a concrete rectangular structure and maintaining the flow line as

C-106 Conveyance Read More »

Arthur Story Park

Over 1 mill yards of excavation. Serco finished the project that other contractors were unable to complete. Serco constructed the grades so that Harris County could build the parkways for the flood retention.

Arthur Story Park Read More »

Hall Park

Former neighborhood that had been purchased by Harris County. Houses had been razed and Serco was brought in to remove all the old waterlines and sanitary lines. Serco excavated a 1.1 million yard basin and constructed the control structures.

Hall Park Read More »

Jersey Meadows

Location: Houston, TX Excavation and offsite disposal of 432,430 CY of soils for storm water detention basin including installation of storm drainage systems and structural concrete drop structure. The challenge was removing thousands of cubic yards of soil in a timely manner and legally disposing of it and to construct the drainage structures and control

Jersey Meadows Read More »

Texas Instruments Gas Plant

Location: Texas Cast in place construction of below grade structural concrete containment trenches for transfer of argon gas from bulk gas plant to computer wafer fabrication plant. Installation required detailed control of rebar, concrete and form elevations in order to set high strength trench grates over system. The challenge here was to construct dual containment

Texas Instruments Gas Plant Read More »

Elm Fork Water Treatment Plant

Location: Dallas, TX Serco was hired by the general contractor to replace the structural floor on the clarifier. We built the access into the clarifier with stairways and panels, and with pump trucks we rebuilt the floor. The challenge was to build it in a manner that was structurally sound and also functioned well with

Elm Fork Water Treatment Plant Read More »

Air Liquide Spindletop

Serco was hired by the mechanical contractor to construct concrete saddles for liquid gas tanks. The challenge was constructing saddles with ¼ inch tolerances to prevent structural damage to the tanks. We were also tasked to install a pump station on the Sabine River. For this job we installed sheet piling, dewatered the area, built

Air Liquide Spindletop Read More »

Conroe Dam Emergency Repairs

Location: Conroe, Texas Repair was critical to Lake Conroe dam due to Hurricane Rita and was extremely time sensitive due to risk of dam slope failure.We successfully moved and placed over 20,000 tons of Grade 1 limestone Rippap over 150 miles in 55 working days with zero incidents.Serco finished this emergency repair 45 days ahead

Conroe Dam Emergency Repairs Read More »