Elm Fork Water Treatment Plant

Location: Dallas, TX

Serco was hired by the general contractor to replace the structural floor on the clarifier. We built the access into the clarifier with stairways and panels, and with pump trucks we rebuilt the floor. The challenge was to build it in a manner that was structurally sound and also functioned well with the clarifier. Survey control was very important. It was built on a sloped concentric type basis. Finished on time and on budget.

Scroll to Top
Skip to content