UNT Art Studio Facility
Location: Denton 18,000 SF of Paving and 25,735 SF of Slab on Grade
UNT Art Studio Facility Read More »
Description.
Location: Denton 18,000 SF of Paving and 25,735 SF of Slab on Grade
UNT Art Studio Facility Read More »
Location: Grand Prairie 156,000 SF of Paving and 76,248 SF of Slab on Grade
Bolder Adventure Park Read More »
Location: Wilmer 577,000 SF of Paving, 930 LF of Retaining Walls, and 23,360 SF of Concrete Panels.
1400 Southport Parkway at Amazon Read More »
Location: Houston Kleb Woods Stormwater Detention Basin Phase 2 ($6,555,813.15) This project was constructed for Harris County Precinct 2 and consisted of the development of Phase 2 of the Kleb Woods stormwater Detention Basin at the northwest corner of the Mueschke Road and future Holderrieth Road intersection. The construction included the provision of traffic control
Location: Houston HCWCID No. 159 Langham Creek Detention Basin Phase 2 ($13,639,775.70) This project was part of a collaborative development between the HCFCD (Harris County Flood Control District) Frontier Program, HCWID (Harris County Water Improvement District) No. 159, and Bridgeland Development. It was designed and constructed to provide stormwater detention and floodplain mitigation and
Location: Houston HCFCD Lauder Stormwater Detention Basin Phase – 2 The Lauder Stormwater Detention Basin – Phase 1 HCFCD (Harris County Flood Control District) Unit P500-06-00- E005) project consisted of excavating a stormwater detention basin located west of the intersection of Lauder Road and John F. Kennedy Blvd. on the south bank of HCFCD Channel
Location: Houston Ditch B & Ditch B-1 Improvements Project for Fort Bend County Levee Improvement District No. 2 Scope of Work for this project includes the excavation and disposal of soils associated with the widening and deepening of Ditch B and Ditch B-1. Additional work items include implementing new pilot channel systems, installation of reinforced
Fort Bend County Levee Read More »
Location: Houston HCFCD – H100-00-00-E005 – Hunting Bayou Federal Flood Risk Management Project, Channel Modifications Scope of work included clearing, grubbing, and excavating approximately 54,248 Cubic Yards of trash and debris with off-site disposal; excavating approximately 2,532 cubic yards of material with on-site disposal; construction of approximately 4,073 Square Feet (SF) of retaining walls (soil
Location: Houston CLCWA Exploration Green Detention Facility Phase 5 ($12,796,248.80) Exploration Green program was created for the primary purpose of stormwater retention and flood mitigation. This was accomplished by retrofitting nearly 200 acres of a defunct golf course, which had become an eyesore for the local residents. The CLCWA (Clear Lake City Water Authority) formed