Air Liquide Spindletop

Serco was hired by the mechanical contractor to construct concrete saddles for liquid gas tanks. The challenge was constructing saddles with ¼ inch tolerances to prevent structural damage to the tanks. We were also tasked to install a pump station on the Sabine River.

For this job we installed sheet piling, dewatered the area, built the pump station, and removed the sheet piling to release the water back onto the pump. The project was finished on time and on budget.

Scroll to Top
Skip to content