Jersey Meadows

Location: Houston, TX

Excavation and offsite disposal of 432,430 CY of soils for storm water detention basin including installation of storm drainage systems and structural concrete drop structure.

The challenge was removing thousands of cubic yards of soil in a timely manner and legally disposing of it and to construct the drainage structures and control structures. Our experienced team provided the resources and knowledge to finish the project on time and on budget.

Scroll to Top
Skip to content