Location: Houston
HCFCD – H100-00-00-E005 – Hunting Bayou Federal Flood Risk Management Project, Channel Modifications
Scope of work included clearing, grubbing, and excavating approximately 54,248 Cubic Yards of trash and debris with off-site disposal; excavating approximately 2,532 cubic yards of material with on-site disposal; construction of approximately 4,073 Square Feet (SF) of retaining walls (soil nail and drill shaft); installation 24,000 SY of concrete channel lining; maintenance access ramps and trails; removing and replacing storm sewer systems.
![HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications-_1 - Serco Construction Group, LTD. hunting bayou federal flood risk management channel](https://www.sercoconstruction.com/wp-content/uploads/2023/08/HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications-_1-1024x768.jpg)
![HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications_2 - Serco Construction Group, LTD. hunting bayou federal flood risk management channel](https://www.sercoconstruction.com/wp-content/uploads/2023/08/HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications_2-1024x768.jpg)
![HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications_2 - Serco Construction Group, LTD. hunting bayou federal flood risk management channel](https://www.sercoconstruction.com/wp-content/uploads/2023/08/HCFCD-H100-00-00-E005-Hunting-Bayou-Federal-Flood-Risk-Management-Project-Channel-Modifications_2-1024x768.jpg)