Arthur Story Park

Over 1 mill yards of excavation. Serco finished the project that other contractors were unable to complete. Serco constructed the grades so that Harris County could build the parkways for the flood retention.

Arthur Story Park Read More »

Hall Park

Former neighborhood that had been purchased by Harris County. Houses had been razed and Serco was brought in to remove all the old waterlines and sanitary lines. Serco excavated a 1.1 million yard basin and constructed the control structures.

Hall Park Read More »

Jersey Meadows

Location: Houston, TX Excavation and offsite disposal of 432,430 CY of soils for storm water detention basin including installation of storm drainage systems and structural concrete drop structure. The challenge was removing thousands of cubic yards of soil in a timely manner and legally disposing of it and to construct the drainage structures and control

Jersey Meadows Read More »