Location: District 6 in Fort Worth, TX
The project required critical elevated pouring of structural floors and control of floor deflection. Serco was asked to help build a police station that was on an elevated metal pan on deck. We coordinated with the metal fabricator and made sure that the steel was installed.
As soon as it was installed, we poured the decks one at a time using various elevated high pumps and finished it to floor specifications.