Sens Road Detention Basin

Posted in Structural concrete

Excavation and offsite disposal of 91,319 CY of soils for storm water detention basin,

construction of 12,488 SY of concrete channel slope paving, 769 CY of cast-in-place

structural concrete E-80 rated boxes, and 2 PZ-27 sheet piling drop structures.

Project required critical control around multiple existing buried pipelines.