Exall Lake

Posted in Structural concrete

Construction of curved linear retaining wall with flame cut granite facing. Work required de-mucking

of Exall Lake along wall line, installation of drilled piers, and extremely critical horizontal and

vertical control of cast in place walls and granite facing was flame cut prior to concrete

wall forming and installation. Tolerances were 1/8 inch or less.