The project required critical elevated pouring of structural floors and control of floor deflection. Serco was asked to help build a police station that was on an elevated metal pan on deck. We coordinated with the metal fabricator and made sure that the steel was installed.

LOCATION: District 6 in Fort Worth, TX

As soon as it was installed, we poured the decks one at a time using various elevated high pumps and finished it to floor specifications.
We finished the project on time and to the client satisfaction.